De-tac Case Studies

O2 Headquarters, Leeds

de-tac the tackifier at the O2O2 This was the phased removal of tackifier across large areas of access floor within the prestigious O2 headquarters offices and amounted to a total area of 7000 m2.

 

BBC- White City London

de-tac the tackifier at the bbcThe BBC had a vinyl access floor which had been carpet tiled, they wanted the floor to return to its original vinyl surface. This required our skill in removing the unwanted tackifier residue.

 

Staples

Floor Adhesive at StaplesOffice store Staples needed carpet tiles removed in four of their stores Liverpool, Derby, Leicester and Birmingham. The purpose of this job was to remove unwanted tackifier under the tiles to reveal the vinyl floor.

 

 

 

 

 

Glasgow Airport

The Cirrus Building at Glasgow Airport needed an access floor of around 900 Square metres de-tackifying. We completed this in three days ready for the new carpets.

 

Leicester Museum

This was a delicate operation as previously a Mosiac floor had been covered in carpet, we had to restore it to a clean and pleasing condition to show in their foyer.

 

Sumitomo Bank

This 850 sq metre operation took 3 days to de-tackify an access floor ready for new Carpet. This job was carried out for New City Cleaners in Bishopsgate London. The Japanese bank was delighted at the outcome.

 

floor tackifier removal

Safety Information

TEL: 07973 561189 FAX: 02476 716394 EMAIL: portmode2000@aol.com